Problem The primary crusher structure at an iron ore facility was exhibiting consistent, unacceptably high vibration levels during operation. The primary crusher operated at approximately 4Hz and was fed from a vibratory feeder operating at approximately 1000tph, at a frequency of 800-1000rpm. Deacon Engineers were contracted to come with a solution and necessary modifications to