Screen House Structural Upgrade for Lift Installation

Project: Screen House Structural Upgrade for Lift Installation
Location: Dampier
Timeframe: July – December 2010
Challenge: Design access platforms and additional support structure for the installation of a lift into the existing screen house structures at Parker Point.

Solution: Concept models were initially produced so that a suitable layout could be chosen by the client for the additional platforms and support structure. Once the client had approved the option, detailed design and drafting was carried out and provided to the client along with a design report.