Gorgon WWTP Tanks

Project: Gorgon WWTP Tanks
Location: Barrow Island
Timeframe: September 2009 – March 2010
Challenge: Design water tanks and associated walkways in accordance with AS3990 and AS1657. Prepared 3D digital prototype and supply manufacturing detail drawings.
Services: Design, FE Analysis, 3D Digital Prototyping and manufacturing detail drawings

Solution: Manufacturing detail drawings were prepared in accordance with Woodside drawing standards.

Recent Projects